 |
Zhangjiagang Municipal Light Industry Equipment Plant.files/de.gif"> |
The vacuum harrows dyadic drying machine |
|
| Zhangjiagang Municipal Light Industry Equipment Plant.files/de.gif"
height=34>1.Drying machine, fast machine, electric motor etc. of examination irrigate a basis according to picture scene, components such as pair of scrolls containing a poetic couplet axis festival, driving force delivery carries out a debugging, the concentricity and perpendicularity degree accord with routine regulation be obliged to after the basis reaches the hardness request.2.All installation carries out an empty load after being finished, testing run, the person tests that time is not smaller than 10 time of blocks of wood less than carrying idler up 4 hours, stopping number of times, moves round there being no the phenomenon rubbing another piece of scuffing generating heat, having no or loosening in process.3.The air inlet pipe must assemble examination pressure attacking the sum piezometer, avoid drying machine surpassing pressure usage on the road.4.Should assemble the sparse water implement or attack the door on gassing pipeline, discharge condensation water regularly should get rid of ponding row at the same time before steam enters drying machine.5.Material should avoid as well as entering varia, prevent mixing, Cheng from seizing up or damage to make the equipment accident.6.The blow vent may take over air exhaust machine or receive an exhaust pipe only, only need highly producing a workshop building meter being easy to exhaust, if the waste gas pollution environment beard handles separately.7.if whose technological process and equipment respond to when the reclaim holds an agent accord with relevant request. |
|
| Zhangjiagang Municipal Light Industry Equipment Plant.files/de.gif"
height=34>1.Respond to every part surveying the equipment before starting up be intact or not, filling lube up with a set moving a nothing is abnormal, the feed mouth is at present unimpeded, and close discharging.2.Start electric racing.3.Open that air admission attacks, condensation water blowoff attacks and dredges the water implement, and the pressure adjusting examination attacks makes the person go down operation in regulation pressure.4.The reinforced implement feeds in raw material, feeds in raw material in general for the volume 80%.Adjustable successively, the rotation rate, the reason are slow when arriving at quickly, if reclaiming menstruum, pay attention to condensing in connection with subsidiary equipment opening and menstruum to reclaim condition.5.The sampling analyses or finished product temperature contents ascertain the rotation rate, drying time, to reach lower operation of optimum state.7.Within being going to use up the material row and clear up, using up condensation liquid row, closing possessions attacking the door, feed adding, preventing dead person from entering machine when parking. |
|
| Zhangjiagang Municipal Light Industry Equipment Plant.files/de.gif"
height=34>1.Process is hit by equipment in the travel, should examine that every turns component lubrication condition, oiling the regular intervals, ensures that lubrication is fine at the regular intervals.2.The form periodic inspection every attacks the door, handling an index, guarantee equipment every part works regularly.3.if running check equipment have condition such as abnormal friction, fever heat, noise, to debug in time.4.Periodic inspection grips if cover have leakage phenomenon. Discover an anomaly responding to early timely trouble shooting.5.When stopping calculation, every part needs to wash ensuring that giving birth to a child next time is regular totally, being in progress. |
 |
|
|
 |
 |